Showing posts with label lighting. Show all posts
Showing posts with label lighting. Show all posts

Wednesday, September 24, 2014

Outdoor Lighting Controller

When you step out of your brightly-lit house  into the darkness, it takes a while for your  vision to adjust. A solution to this problem  is this outdoor light with automatic switch-off. As a bonus, it will also make it a little bit  easier to find the keyhole when returning  late at night. Often no mains neutral connection is avail-able at the point where the switch-off timer  is to be installed, which makes many circuit  arrangements impractical. However, the circuit here is designed to work in this situation. The design eschews bulky components such as transformers and the whole unit can  be built into a flush-mounted fitting. The circuit also features low quiescent current consumption.

Outdoor Lighting Controller Circuit Diagram :

Outdoor Lighting Controller-Circuit Diagram
The circuit is star ted by closing switch (or  pushbutton) S1. The lamp then immediately receives power via the bridge rectifier. The drop across diodes D5 to D10 is 4.2 V, which provides the power supply for the delay circuit itself, built around the CD4060 binary  counter.

When the switch is opened the lighting sup-ply current continues to flow through Tri1. The NPN optocoupler in the triac drive circuit detects when the triac is active, with antiparallel LED D1 keeping the drive sym-metrical. The NPN phototransistor inside the  coupler creates a reset pulse via T1, driving  pin 12 of the counter. This means that the  full time period will run even if the circuit is retriggered. The CD4060 counts at the AC grid frequency.  Pin 3 goes high after 213clocks, which corresponds to about 2.5 minutes. If this is not long  enough, a further CD4060 counter can be cascaded. T2 then turns on and shorts the internal LED of opto-triac IC2; this causes Tri1 to  be deprived of its trigger current and the light  goes out. The circuit remains without power until next triggered.

The circuit is only suitable for use with resistive loads. With the components shown (in particular in the bridge rectifier and D5 to  D10) the maximum total power of the connected bulb(s) is 200 watts. As is well known, the filament of the bulb is most likely to fail at the moment power is applied. There is little risk to Tri1 at this point as it is bridged by  the switch. The most likely consequence of overload is that one of diodes D1 to D6 will  fail. In the prototype no fuse was used, as it would not in any case have been easy to change. However, that is not necessarily recommended practice!

Circuits at AC line potential should only be constructed by suitably experienced persons and all relevant safety precautions and  applicable regulations must be observed during construction and installation.
 
 
 
 
Author : Harald Schad - Copyright : Elektor
Read more

Tuesday, September 23, 2014

Holiday Lighting Sequencer Circuit Diagram

Flasher bulbs use a bi-metallic strip which interrupts the series circuit when the lamp becomes hot.. This is a Best Holiday Lighting Sequencer Circuit Diagram. This is Integrated circuit Ul (a 555 oscillator/timer) is wired as a conventional pulse generator. The frequency of the pulse generator is controlled by potentiometer Rll. Resistor R2 puts a reasonable limit on the highest speed attainable. The output of the pulse generator is fed to the common clock input of U2, a 74C175 quad D-type flip-flop. 

 Best Holiday Lighting Sequencer Circuit Diagram

  Best Holiday Lighting Sequencer Circuit Diagram
Each flip-flop is configured so that its Q output is coupled to the D input of the subsequent flip-flop. Information on the D input of each flip-flop is transferred to the Q (and Q) outputs on the leading edge of each clock pulse. Switch S2 allows you to invert the information on the D input of the first flip-flop at any time during the cycle. This allows you to create a number of different sequences, which are determined by the state of the CQ output at the time of the switching. 
However, if S2 is switched to position while all outputs are high or all are low (which seldom occurs), the sequence stops and the outputs remain either all on or all off. If that happens, you only need to switch back to position A for at least one pulse duration, then back to position again. Likewise, S2 should be in position A (pin 4 connected to pin 14) each time the power is turned on. This is because the data on pin 4 must be a logic 1 in order to start a sequence; otherwise all outputs remain at logic 0, regardless of the clock pulses. Each output of the sequencing circuit is connected to an MOC3010 opto isolator/coupler (U3 through U6), which contains an infrared-emitting diode with an infrared-sensitive diac (triac driver or trigger) in close proximity. The diac triggers the triac, which carries the 117-volts ac. 
Each time that the infrared- emitting diode receives a logic 1, it turns on and causes the diac to conduct. With the opto isolator/coupler`s internal diac conducting, the triac turns on, and power is supplied to whatever load is plugged into the corresponding ac socket. So, the sequencing circuit and the 117-V ac outputs are optically coupled and are effectively isolated from each other. Power for the sequencing circuit is provided by a 6.3-V miniature transformer. The output of the transformer is rectified by a four-diode bridge circuit, the output of which is filtered by CI (1000- electrolytic capacitor). Capacitor C3 is added at the supply pin of IJ2 to suppress transients. Sourced By: Circuitsstream
Read more

Friday, September 19, 2014

Smart Lighting in the Enterprise

Daylight harvesting is becoming increasingly important in the design and implementation of commercial lighting systems. Being able to integrate the natural light from windows with flexible, controllable sources of lighting helps improve the work environment and cut energy bills.
Smart Lighting in the Enterprise
Being able to have closer control of the lighting systems in a commercial environment is a key element to this strategy and energy harvesting can play an important role. Being able to have flexible placement of control pads for a commercial lighting system is an important requirement as office space is regularly reconfigured as existing clients grow and change their requirements and new clients have new requirements. [Link]
Read more